Service Fees

City of Irrigon Master Fee Schedule – Effective 7/1/2016

Planning/Zoning Fees 
Lot Line Adjustment$200.00
Annexation$1,500.00
Variance$325.00
Minor Partition$350.00
Major Partition$425.00
Replat: Minor 1-2 parcels$300.00
           Major 3+ parcels$425.00
Zone Change$1,100.00
Zone Ch w/Comp Amendment$1,800.00
Appeal-City Council$250.00
Appeal- Planning Commission$125.00
Plan/Admin Review$400.00
Comp Plan Amendment$900.00
Road Dedication$275.00
Site Review$75.00
Vacation of Street/Alley$500.00
Subdivision ($3,500.00 max)$1,400.00
plus per lot$35.00
Review Pre-Application$200.00
Conditional Use$425.00
Temporary Use$125.00
Zoning & Development Interp.$250.00
Sewer RatesMonthly
Class I and II 
Single Family Detached Residence (1 ERU *) 
Basic Utility Charge (Swr)$46.17
User Loan Fee (Sbnd)$14.88
Manufactured Home Parks (1 ERU) 
Basic Utility Charge (Swr)$46.17
User Loan Fee (Sbnd)$14.88
Duplexes/Multi Plexes (per apartment) (1 ERU) 
Basic Utility Charge (Swr)$46.17
User Loan Fee (Sbnd)$14.88
DescriptionFee
Administration
Photocopies 
       8.5 x 11 per page/side B&W$0.30
       8.5 x 11 per page/side Color$1.00
  
NSF (Returned Check)$35.00
Council Candidate Filing Fee$15.00
Lien Search$25.00
Budget Document$20.00
Notary Services$5.00
Election Fee$15.00
Jury Failure Notice$50.00
Jury Compensation – per day$10.00
Maps (color charges 2.00 extra) 
       Property- single site$2.50
       8.5 x 11$4.00
Special Projects/Records RequestsTime & Materials
Code Violations    #1 
Title 3 (Business & Lic.$100.00
Title 4 (Health and Sanitation)$450.00
Title 4 Grafitti (1st $500, additional $1,000) 
Title 5 (Public Safety)$300.00
Title 6 Vehicle & Traffic$450.00
Title 7 Public Property$300.00
Title 9 & 10 Bldg and Development$250.00
  
Public Works Fees 
Re-locate Fee$35.00
Personal Request (1st time free)$45.00
Meter Change-Owner Request$225.00
Water Connection Fee$1,115.00
Hydrant Meter ($750 refundable)$900.00
             Min. Charge <4,000 gal$75.00
Water Charge per Gal-Tanker only$0.03
SDC     Water$1,946.00
               Sewer$2,626.00
               Parks$500.00
               Transportation$0.00
Non Emergency/After Hours$126.00
Owner St. Light Request$2,000.00
City Winterization Package$45.00
Sewer Pump Damage-w/in warranty$700.00
Sewr Pump Damage-out warranty$175.00
Sewer Tank lid Damage$125.00
Sewer Calls (fats,oils, grease,etc.)$85.00
Lagoon Disposal Fee0.16 gallon
FOG Violation 
Request Tank Pumped-non maint. 
City Permits / Licenses & Fees
Liquor License – Annual$25.00
Liquor License – New$50.00
Liquor License – Temporary$35.00
Park Liquor Permit$40.00
Gaming Permit per year$25.00
Sidewalk Café Permit$40.00
Dog License (spayed/neutered)$10.00
Dog License (intact)$20.00
Sign Permit$30.00
Plumbing (only) Permit$15.00
Backflow Testing 
Lighting Permit$15.00
Misc Permit (deck, patio cover)$15.00
Work in ROW (w/ conditions)$50.00
Street Closure (per day)$25.00
Road Crossing (w/conditions)$50.00
Business License (annual)$15.00
Manufactured Home Placement$65.00
Driveway Permit (w/ conditions)$50.00
Fence Permit (w/conditions)$30.00
Solicitors Permit     > 30 days$25.00
                                 Annual$50.00
Demolition Permit$50.00
Home Business$25.00
Impound Fee – Cat$25.00
Impound Fee – Dog$60.00
  
Use of City Facilities       (Ins. Proof Required)
Community Meeting Room 
       First 4 hours$25.00
       All day$50.00
       Civic Groups$10.00
Government Organizations$0.00
Cleaning Deposit ($75 refundable)$100.00
  
Park Reservation Fees (exclusive use) (Proof Ins.)
     Resident$25.00/day
     Non-Resident$40.00/day
Government Organizations$0.00
Park Cleaning Deposit$25.00
Cleaning Deposit$25.00
  
Utility Fees
Account Deposit (water&sewer)$150.00
Sewer Reconnect -plus actual costs$250.00
Water Reconnection Fee$35.00
Water Turn-on After Hours$100.00
Late Payment Fee$5.00
Sewer Only Deposit$300.00
Vacation of Street/Alley$500.00
Sewer Rates Cont.Monthly
Class I and II 
RV Parks (per space) (.5 ERU) 
Basic Utility Charge (Swr)$23.09
User Loan Fee (Sbnd)$7.44
Motel/Hotel (per unit) (.5 ERU) 
Basic Utility Charge (Swr)$23.09
User Loan Fee (Sbnd)$7.44
RV Subdivision 
Permanent Dwelling (1 ERU) 
Basic Utility Charge (Swr)$46.17
User Loan Fee (Sbnd)$14.88
Permanent Dwelling+ Connected RV (1.5 ERU) 
Basic Utility Charge (Swr)$69.26
User Loan Fee (Sbnd)$22.32
Class III 
Churches, Public Buildings (senior center, library, etc.) (2.2 ERU) 
Basic Utility Charge (Swr)$101.57
User Loan Fee (Sbnd)$32.74
Businesses without Food Preparation (2.2 ERU) 
Basic Utility Charge (Swr)$101.57
User Loan Fee (Sbnd)$32.74
Businesses with Food Preparation (5.1 ERU) 
Basic Utility Charge (Swr)$235.47
User Loan Fee (Sbnd)$75.89
Schools (9.2 ERU) 
Basic Utility Charge (Swr)$424.76
User Loan Fee (Sbnd)$136.90
Resturant and Lounge Combonations (8.5 ERU) 
Basic Utility Charge (Swr)$392.45
User Loan Fee (Sbnd)$126.48
Outside City Service (per ERU) 
Basic Utility Charge (Swr)$46.17
User Loan Fee (Sbnd)$29.67
  
Connection Fee (septic effluent system)$2,400.00
Connection Fee (septic effluent pump system)$3,800.00
Connection Fee (conventiaonal)$1,800.00
Water RateMonthly       
Basic Utility Charge (wtr) 1,336 cu ft$23.63
User Loan Fee (Wbnd)$15.32
Rented, Occupied, or Vacant (Site Built, Manufactured Home/Trailer Park, Duplex/Mulit-Plex, and RV Sub-division)
Outside City Limits (Wtr) 1,336 cu ft$23.63
User Loan Fee (Wbnd)$25.94
Rented, Occupied, or Vacant (Site Built, Manufactured Home/Trailer Park, Duplex/Mulit-Plex, and RV Sub-division)
Charge (beyond minimum) cu ft$0.02
  
User Fees                                             Monthly
Street Light User Fee$2.00
Street Maintenance User Fee$3.00
Police Service User Fee$5.00

Notes:

  1. Except as covered under ORS
  2. User Loan Fee to be a monthly minimum, non-metered charge, whether occupied, rented and/or vacant that is or has been constructed for a permanent full time use (site build, manufactured home, trailer park, duplex/multi-plex, and RV Sub-Division
  3. ERU = Equivalent Residential Unit